Nadara in Spain
Spain is one of Europe’s renewable powerhouses and we’ve operated sites in the country since 2004.
Our 400MW Madrid A+B project will see the co-location of wind and solar energy across five sites in Valladolid and Palencia, creating a model for how renewables can scale faster and more efficiently. This hybridisation project underlines Nadara’s growth ambitions in Spain and our commitment to supporting the country’s energy transition. Alongside the UK and Italy, Spain also hosts our Sustainable Communities Forum, strengthening local engagement and supporting community initiatives.
17
Onshore wind plants
1
Solar PV plant
653.73MW
Installed capacity (total)
News and updates All news articles
Recent articles
Our sites in Spain
Filter options
30 projects
Campos Salados
- Spain
- Solar
- Awaiting authorisation
Installed capacity
48 MW
Energy produced
200,000 MWh/year
CO2 reductions
35,949 t/year
Campos Salados project will be located in the municipality of Carcaixent, in the province of Valencia. This new photovoltaic park is estimated to produce 200 GWh/year, enough to supply energy to more than 30,000 households.
Bon Vent Vilalba
- Spain
- Wind
- Operational
Installed capacity
52 MW
Energy produced
118,781 MWh/year
CO2 reductions
20,320 t/year
Bon Vent Vilalba Wind Farm has an installed capacity of 51.8MW and comprises 21 Vestas V90 turbines.
Cabezo de San Roque
- Spain
- Wind
- Operational
Installed capacity
23 MW
Energy produced
47,494 MWh/year
CO2 reductions
15,000 t/year
Cabezo de San Roque Wind Farm is located in the municipality of La Muela, around 18 miles south-west of Zaragoza in the Spanish region of Aragon. It is situated on a vast plateau, around 2,000 feet above sea level. The 23.25MW site comprises 31 turbines.
Campanario
- Spain
- Wind
- Operational
Installed capacity
38 MW
Energy produced
88,730 MWh/year
CO2 reductions
15,250 t/year
Campanario Wind Farm comprises 19 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 38MW.
Campos de Levante
- Spain
- Solar
- Awaiting authorisation
Installed capacity
102 MW
Energy produced
200,000 MWh/year
CO2 reductions
41,780 t/year
The PSF Campos de Levante project will be located in Chiva, Valencia. This new photovoltaic plant will produce an estimated 200 GWh/year, enough to supply energy to more than 80,000 households.
Campos de Zuloaga
- Spain
- Solar
- Awaiting authorisation
Installed capacity
56 MW
Energy produced
119,000 MWh/year
CO2 reductions
24,859 t/year
Campos de Zuloaga project will be located between the municipalities of Cizur and Cendea de Olza in Navarra (Spain). This new photovoltaic park is estimated tol produce 119 GWh/year, enough to supply energy to more than 20,000 households.
Carrecastro
- Spain
- Wind
- Operational
Installed capacity
10 MW
Energy produced
28,497 MWh/year
CO2 reductions
17,000 t/year
Carrecastro Wind Farm comprises four Gamesa G114 turbines, for a total installed capacity of 10MW. The project included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation.
Castillo Eólico León
- Spain
- Wind
- Awaiting authorisation
Installed capacity
75 MW
Energy produced
235,000 MWh/year
CO2 reductions
49,091 t/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Castillo Eólico Palencia
- Spain
- Wind
- Awaiting authorisation
Installed capacity
144 MW
Energy produced
510,000 MWh/year
CO2 reductions
106,539 t/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Cerros de Radona
- Spain
- Wind
- Operational
Installed capacity
40 MW
Energy produced
87,398 MWh/year
CO2 reductions
14,403 t/year
Cerros de Radona Wind Farm has an installed capacity of 40MW from its 16 GE2.5XL 2500kW-rated turbines.
Dehesilla I
- Spain
- Wind
- Operational
Installed capacity
50 MW
Energy produced
88,066 MWh/year
CO2 reductions
14,832 t/year
The Dehesilla I wind farm comprises 25 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 50MW.
Dehesilla II
- Spain
- Wind
- Operational
Installed capacity
50 MW
Energy produced
89,732 MWh/year
CO2 reductions
14,635 t/year
The Dehesilla II wind farm comprises 25 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 50MW.
Desafio Solar
- Spain
- Solar
- Operational
Installed capacity
50 MW
Energy produced
88,637 MWh/year
Nadara's Desafio Solar plant is located to the south-east of Zaragoza, close to the river Ebro. It has a total installed capacity of 49.88MW.
El Nogal
- Spain
- Wind
- Operational
Installed capacity
24 MW
Energy produced
61,676 MWh/year
CO2 reductions
10,667 t/year
El Nogal Wind Farm comprises 12 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 24MW.
Esquileo
- Spain
- Wind
- Operational
Installed capacity
50 MW
Energy produced
89,121 MWh/year
CO2 reductions
15,135 t/year
Esquileo Wind Farm comprises 25 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 50MW.
Fatarella
- Spain
- Wind
- Operational
Installed capacity
48 MW
Energy produced
150,260 MWh/year
CO2 reductions
25,896 t/year
Fatarella Wind Farm comprises 21 Siemens SWT2.3 turbines rated at 2300kW each for a total installed capacity of 48.3MW.
Fuente Vain
- Spain
- Wind
- Operational
Installed capacity
32 MW
Energy produced
82,571 MWh/year
CO2 reductions
14,196 t/year
Fuente Vain Wind Farm comprises 16 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 32MW.
Fuentes
- Spain
- Wind
- Operational
Installed capacity
18 MW
Energy produced
42,946 MWh/year
CO2 reductions
7,304 t/year
Fuentes Wind Farm comprises nine Vestas V90 turbines rated at 2000kW each for a total installed capacity of 18MW.
La Dehesica
- Spain
- Wind
- Operational
Installed capacity
29 MW
Energy produced
69,614 MWh/year
CO2 reductions
10,614 t/year
La Dehesica Wind Farm comprises 19 GE 1.5SLE turbines rated at 1500kW each for a total installed capacity of 28.5MW.
La Navica
- Spain
- Wind
- Operational
Installed capacity
30 MW
Energy produced
74,136 MWh/year
CO2 reductions
12,007 t/year
La Navica Wind Farm comprises 20 GE 1.5XLE turbines rated at 1500kW each for a total installed capacity of 30MW.
Munera I
- Spain
- Wind
- Operational
Installed capacity
44 MW
Energy produced
120,224 MWh/year
CO2 reductions
18,110 t/year
Munera I Wind Farm comprises 22 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 44MW.
Perales
- Spain
- Wind
- Awaiting authorisation
Installed capacity
48 MW
CO2 reductions
106,539 t/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Porqueros
- Spain
- Wind
- Awaiting authorisation
Installed capacity
25 MW
CO2 reductions
49,091 t/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
San Lorenzo D
- Spain
- Wind
- Operational
Installed capacity
36 MW
Energy produced
61,912 MWh/year
CO2 reductions
9,470 t/year
San Lorenzo D Wind Farm comprises 18 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 36MW.
San Lorenzo C
- Spain
- Wind
- Operational
Installed capacity
30 MW
Energy produced
52,484 MWh/year
CO2 reductions
8,189 t/year
San Lorenzo C Wind Farm comprises 15 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 30MW.
Santo Toribio
- Spain
- Solar
- Awaiting authorisation
Installed capacity
64 MW
Energy produced
126,000 MWh/year
CO2 reductions
36,900 t/year
Nadara’s PSF Santo Toribio project will be located in Chiva, in Valencia (Spain). This new photovoltaic park will mean an estimated production of 126 GWh/year, enough to supply energy to more than 80,000 homes. The Chiva photovoltaic solar energy facility, whose construction is scheduled to begin in 2023, plans to occupy around 111 hectares and additionally reforest another 39.
Ucedo
- Spain
- Wind
- Awaiting authorisation
Installed capacity
25 MW
CO2 reductions
49,091 t/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Veldedo
- Spain
- Wind
- Awaiting authorisation
Installed capacity
25 MW
CO2 reductions
49,091 t/year
The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.
Villaherreros
- Spain
- Wind
- Awaiting authorisation
Installed capacity
48 MW
CO2 reductions
106,539 t/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.
Villaumbrales
- Spain
- Wind
- Awaiting authorisation
Installed capacity
48 MW
CO2 reductions
106,539 t/year
The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.