Wind turbines in snowy conditions at Novar wind farm

Novar 1 Repowering

55.8MW

Combined generating capacity

151,041MWh

Estimated annual generation

45,453households

Equivalent to approximate annual consumption

65,835t/year

CO2 avoided

(compared to energy produced with coal)

Novar Wind Farm sits in a picturesque Highland location approximately 5.5 miles west of Alness. From its elevated position on an extensive Easter Ross shooting estate it enjoys commanding views of the Cromarty Firth and Ben Wyvis.

As well as being steeped in the history of Scotland's Highland clans, the area is well known for its contribution to Highland employment with a number of light and heavy industries based locally. The yards at Invergordon and Nigg play a significant role in offshore development in the oil and gas sectors and, more recently, have been heavily involved in fabrication for renewables including offshore wind farms.

Novar was built in 1997 and its 34 turbines are rated at 500kW giving the site has an installed capacity of 17MW, generating enough energy to power 14,027 homes.

Repowering Project

Aerial photo of cranes alongside a wind turbine at Novar wind farm

Project updates

  1. 10 Nov 2026

    Planning Application

    A planning application to repower Novar Wind 1 Wind Farm has now been submitted to the Energy Consents Unit. The planning application reference number is ECU00006087.

    The application comprises the following documents, which can be downloaded below.

    • Environmental Impact Assessment Report (EIAR):
      • Volume 1: Non-Technical Summary (NTS)
      • Volume 2: Main Report
      • Volume 3a: Figures
      • Volume 3b: NatureScot visualisations
      • Volume 3c: THC visualisations
      • Volume 4: Technical Appendices
      • Volume 5: Confidential Appendices
    • Supplementary documents

    Paper copies of the EIAR are be available at the following locations:

    • Cornerstone Café, 16 Balconie Street, Evanton, IV16 9UN 
      (Opening hours: Tuesday to Thursday: 10:00 – 14:00)
    • Alness Library, Averon Leisure Centre, High Street, IV17 0QB 
      (Opening hours: Monday to Thursday: 08:00 – 22:00; 08:00-21:00 Friday; 09:00 – 14:00 Saturday)
    • The Highland Council Dingwall office, 84 High Street, Dingwall, IV15 9QN 
      (Monday, Wednesday and Friday: 09:30 – 12:30; Tuesday and Thursday: 09.30 – 12.30 and 13:30 – 16:00)

    The application documents are available on the Scottish Government Energy Consents portal (ref: ECU00006087) (https://www.energyconsents.scot/Default.aspx).

    We would like thank everyone who has engaged in the project development process and look forward to ongoing dialogue.

  2. 27 Aug 2025
  3. 4 Mar 2025

Novar 1 Repowering Application Documents

Get in touch

Suppliers registration