Lambrigg Wind Farm
6.5MW
Installed capacity
Additional generating capacity
17,822 MWh/year
Energy produced
Estimated annual power generation
7,984 t/year
CO2 reductions
Avoided annually (compared to existing National Grid mix)
Lambrigg Repower & Extension
We are exploring the potential to repower and extend Lambrigg Wind Farm. We would propose to decommission and remove the existing turbines and thereafter erect 7 new turbines up to 200m to tip. This could deliver an uplift in capacity from 6.5MW to ~42MW of renewable electricity - strengthening the UK’s energy security and contributing to our green power future.
Project Proposal:
7 new turbines
Up to 180-200m tip height
Up to 42MW capacity.
Project timeline
Autumn 2025 : Initial works begin on the project
Autumn 2026 : Scoping submission and first round of public consultation exhibitions
Early Summer 2027 : Second round of public consultation exhibitions
Autumn 2027 : EIA planning application submission
Autumn/Winter 2027 : Statutory consultation period
2028/2029 : Recommendation and Decision
Local impact
Lambrigg Wind Farm has been operating since September 2000. In that time, it has delivered a range of local opportunities for the regional supply chain and the community.
Community Benefit
If consented, Lambrigg Repowering and Extension, would create a community benefit fund of up to £210,000 each year – totalling over £7 million across the projects anticipated 35-year lifespan.
Community ownership
We want to work with the local community and explore the potential to provide community ownership.
At several of our wind farms we have co-operatives which enable people to buy a stake in their local wind farm.
If you’d like to know more, contact our project team at Lambrigg@nadara.com
Supply chain
We are proud to be a Partner Member of the Cumbria Chamber of Commerce, helping us maintain strong connections with the local business community and support economic growth across the region.
We are interested in engaging with businesses from across the local area that may have the skills, services or expertise to support the project through all stages.
If you represent a local company and would like to register your interest as a potential supplier, please visit nadara.com/our-suppliers.
Public Exhibitions
Tuesday 29th September 2026
11:00am - 8:00pm
New Hutton Institute, New Hutton, Kendal, LA8 0AS
Wednesday 30th September 2026
11:00am - 8:00pm
Grayrigg Institute, Grayrigg, Kendal, LA8 9BU
Useful Documents
Useful Documents
Scoping Documents
-
Figure 11 1 Site Layout and Cultural Heritage Study Areas
-
Figure 10 1 Transport Plan
-
Figure 9 3 Hydrogeology
-
Figure 9 2 Groundwater Bodies
-
Figure 9 1 Interpolated Peat Depths
-
Figure 8 4 EA Surface Water Flood Map
-
Figure 8 3 EA Flood Map Rivers and Sea
-
Figure 8 2 Surface Water Hydrology
-
Figure 15 1 Shadow Flicker Study Area
-
Figure 13 3 P Ro W and National Parks
-
Figure 13 2 Index of Multiple Deprivation
-
Figure 13 1 Soc economic Tourism and Recreation Study Area
-
Figure 12 2 Cumulative Developments
-
Figure 12 1 Noise Sensitive Receptors
-
Figure 11 3 Designated Assets within 15 km
-
Figure 11 2 Designated and Non Designated Assets within 5 km
-
Figure 5 3 Landscape Designations
-
Figure 5 2 Landscape Character Areas and Types
-
Figure 5 1 Landscape and Visual Assessment Study Area
-
Figure 1 2 Site Layout
-
Figure 1 1 Site Location
-
Figure 8 1 Hydrology Study Area
-
Figure 7 3 Ornithology Survey Areas
-
Figure 7 2 VP Locations and Viewsheds
-
Figure 6 3b Local Record Protected Plants and Invertebrates
-
Figure 6 3a Local Record Protected Species
-
Figure 6 2 ERM Protected Species Survey Results
-
Figure 6 1 Statutory Designations
-
Figure 5 7 Comparative ZTV 50 km
-
Figure 5 6 Turbine Blade Tip Height ZTV 20 km
-
Figure 5 5 Turbine Blade Tip Height ZTV 45 km
-
Figure 7 1 Ornithological Designated Sites
-
Lambrigg Repowering and Extension Scoping Report
-
Figure 11 1 Site Layout and Cultural Heritage Study Areas
Public Exhibition
Get in touch
If you would like to send us your thoughts or questions regarding the project, please fill out this contact form or send an email to lambrigg@nadara.com
The information you provide here is collected solely to process your request regarding this project and will not be shared with third parties.