Ty-Ru
- France
- Wind
- Operational
Installed capacity
10 MW
Energy produced
19,437 MWh/year
CO2 reductions
16,000 t/year
Ty-Ru Wind Farm is located near the English Channel, 6 miles to the east of Morlaix and very close to the national road going to Brest and Rennes. Around half a mile south of the site is the Monts d’Arrée massif, the highest point in Brittany at 1,263 feet. The land on which the site is located belongs to private owners who use it for agriculture and stockbreeding. Energy production is channeled to a power station approximately 5 miles away via an underground cable following existing roads to minimise the environmental impact.