Spinasanta

  • Italy
  • Solar
  • Operational
  • Installed capacity

    6 MW

  • Energy produced

    9,583 MWh/year

  • CO2 reductions

    3,700 t/year

The Spinasanta solar plant comprises polycrystalline photovoltaic modules which are south facing and tilted at a 20° angle to optimise the annual yield of the site.

Stivaletta

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    54 MW

  • Energy produced

    106,510 MWh/year

  • CO2 reductions

    28,608 t/year

The 54.1 MWp photovoltaic agricultural plant in the municipality of Ginosa (TA), in the locality of Stivaletta, combines the production of renewable energy, equal to the needs of over 41 thousand families, with the enhancement of organic agriculture, with areas dedicated to beekeeping and different types of crops, including cereal crops dedicated to animal feed and areas dedicated to the breeding/shelling and grazing of the same animals in compliance with the environmental peculiarities of the territory.

The project uses innovative methods, which have already been successfully adopted in other countries, and which represent a novelty in Italy, thanks to the use of technological/agricultural skills that generate a beneficial impact on the territory

Website

Stromar

  • United Kingdom
  • Wind
  • Awaiting authorisation
  • Installed capacity

    1,000 MW

Nadara, Orsted and Blue Float Energy have joined forces to develop the Stromar floating offshore wind farm off the coast of Caithness as part of the ScotWind leasing round.

Taff Ely

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    9 MW

  • Energy produced

    24,677 MWh/year

  • CO2 reductions

    11,055 t/year

Taff Ely Wind Farm is one of the first generation of wind farms to be built in the UK. It's located near Bridgend in South Wales, approximately two kilometres south of the village of Black Mill and three kilometres west of Tonyrefail. It was constructed in 1993 using turbines manufactured by Nordtank Energy AS. Taff Ely's 20 turbines are rated at 450kW, giving the site an installed capacity of 9MW.

Tarzy

  • France
  • Wind
  • Operational
  • Installed capacity

    8 MW

  • Energy produced

    18,238 MWh/year

  • CO2 reductions

    1,290 t/year

Tarzy Wind Farm comprises four Vestas V100 turbines rated at 2000kW each for a total installed capacity of 8MW.

Tedder Hill

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    8 MW

  • Energy produced

    20,564 MWh/year

  • CO2 reductions

    9,213 t/year

Tedder Hill Wind Farm is situated on farmland between the charming villages of Roos and Rimswell in the south of East Riding in Yorkshire. Construction commenced in October 2012 and the turbines began commercial operations in July 2013. The wind farm, whose three wind turbines have a maximum tip height of 111m from the turbine base to the blade tip, became part of the4 Nadara portfolio in 2018. The turbines are rated at 2.5MW, giving the site an installed capacity of 7.5MW with the ability to generate enough energy to power 6,188 homes.

Terzo d'Aquileia

  • Italy
  • Solar
  • Operational
  • Installed capacity

    33 MW

  • Energy produced

    50,000 MWh/year

  • CO2 reductions

    14,088 t/year

The Terzo d'Aquileia solar plant falls within the Municipality of Cervignano del Friuli (province of Udine) in north-eastern Italy. It occupies an area of approximately 6,550 square meters including access roads.

Website

Tibula Energia

  • Italy
  • Wind
  • Awaiting authorisation
  • Installed capacity

    975 MW

Nadara is developing the 975MW Tibula Energia floating offshore wind farm off the north-eastern coast of Sardinia.

Website

Todo o Mundo

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    28,147 MWh/year

  • CO2 reductions

    3,347 t/year

Todo o Mundo Wind Farm comprises five Vestas V80 turbines rated at 2000kW each for a total installed capacity of 10MW.

Todo o Mundo OVP

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    2 MW

  • Energy produced

    7,632 MWh/year

  • CO2 reductions

    912 t/year

The Todo o Mundo overpowering site comprises a single Senvion MM100 turbine for a total installed capacity of 2MW.

Tow Law

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    2 MW

  • Energy produced

    6,334 MWh/year

  • CO2 reductions

    2,838 t/year

Tow Law Wind Farm is situated close to the former mining village of the same name in County Durham, which is famously mentioned in the first line of the Mark Knopfler song, 'Hill Farmer's Blues'. The wind farm is just one mile north east of the town centre on the B6301 and is built on an area of open cast land that has been restored to a mix of heathland and agriculture. Tow Law's three turbines, which came into service in December 2001, are rated at 770kW, giving the site an installed capacity of 2.31MW with the ability to generate enough energy to power 1,906 homes.

Tre Mulini

  • Italy
  • Wind
  • Awaiting authorisation
  • Installed capacity

    18 MW

  • Energy produced

    51,480 MWh/year

  • CO2 reductions

    12,800 t/year

The wind plant called Tre Mulini is located in the municipality of San Sostene, in the province of Catanzaro, has a total nominal power of 18.3MW and will consist of 3 turbines of 6.1MW of unit power.

Website

Truc de l'Homme

  • France
  • Wind
  • Operational
  • Installed capacity

    12 MW

  • Energy produced

    16,599 MWh/year

  • CO2 reductions

    942 t/year

Truc de l'Homme Wind Farm comprises seven Alstom-Ecotècnia ECO74 turbines rated at 1670kW each for a total installed capacity of 11.69MW.

Trysglwyn

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    6 MW

  • Energy produced

    15,355 MWh/year

  • CO2 reductions

    6,879 t/year

Trysglwyn Wind Farm is situated on farmland that's used for grazing sheep and cattle as well as for arable purposes. The wind farm is accessed via an unclassified road that connects it with the village of Rhosboyl in Anglesey. Rhosboyl (with a population of around 1,100) is about 2.5 miles from the town of Amlwch which was the second largest town in Wales in the late 18th century thanks to the nearby copper mine at Parys Mountain. Construction work on Trysglwyn Wind Farm began in 1996, taking around a year to complete. Its 14 turbines are rated at 400kW, giving the site an installed capacity of 5.6MW with the ability to generate enough energy to power 4,621 homes.

Ty-Ru

  • France
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    19,437 MWh/year

  • CO2 reductions

    16,000 t/year

Ty-Ru Wind Farm is located near the English Channel, 6 miles to the east of Morlaix and very close to the national road going to Brest and Rennes. Around half a mile south of the site is the Monts d’Arrée massif, the highest point in Brittany at 1,263 feet. The land on which the site is located belongs to private owners who use it for agriculture and stockbreeding. Energy production is channeled to a power station approximately 5 miles away via an underground cable following existing roads to minimise the environmental impact.

Ucedo

  • Spain
  • Wind
  • Awaiting authorisation
  • Installed capacity

    25 MW

  • CO2 reductions

    49,091 t/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Union Spring 40

  • United States
  • Solar
  • Operational
  • Installed capacity

    8 MW

  • Energy produced

    8,814 MWh/year

  • CO2 reductions

    775 t/year

Union Spring 40 is a Community Solar project in upstate New York.

Union Spring 963

  • United States
  • Solar
  • Operational
  • Installed capacity

    8 MW

  • Energy produced

    8,388 MWh/year

  • CO2 reductions

    775 t/year

Union Spring 963 is a Community Solar project in upstate New York.

Vado Ligure Storage

  • Italy
  • Storage
  • Operational
  • Installed capacity

    9 MW

Vado Ligure Storage is a BESS (Battery Energy Storage System), consisting of two 4800kVA inverters and two separate battery assemblies, with Lithium Ion stechnology, for a total apparent power of 9MW and 8MWh of installed capacity. The project is part of the Fast Reserve pilot projects pursuant to ARERA Resolution 300/17/R/eel, aimed at introducing an ultra-rapid activation grid service in compliance with the Ultra-Rapid Frequency Regulation Service Regulation.

Website

Valle di Zasa

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    30 MW

  • Energy produced

    51,600 MWh/year

  • CO2 reductions

    13,900 t/year

Valle di Zasa photovoltaic plant in the province of Palermo has a total rated power of about 29.87 MW divided into five macro areas. The largest portion of the plant – 4 out of 5 areas – is located in the territory of the municipality of Campofelice di Fitalia; one area in the territory of the municipality of Mezzojuso; while in the territory of the municipality of Ciminna, the storage system and infrastructure for connecting the plant to TERNA SpA’s grid will be built.