Lousã II
- Portugal
- Wind
- Operational
Installed capacity
50 MW
Energy produced
135,028 MWh/year
CO2 reductions
16,092 t/year
Lousã II Wind Farm comprises 20 Nordex N90 turbines rated at 2500kW each for a total installed capacity of 50MW.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
141 – 160 of 257 projects
50 MW
135,028 MWh/year
16,092 t/year
Lousã II Wind Farm comprises 20 Nordex N90 turbines rated at 2500kW each for a total installed capacity of 50MW.
10 MW
33,007 MWh/year
3,980 t/year
The Lousã II overpowering site comprises five Senvion MM100 turbines rated at 2000kW each for a total installed capacity of 10MW.
8 MW
22,483 MWh/year
10,073 t/year
If you're ever driving between junctions 20 and 21 on the south bound side of the M1, you'll most likely spot the four most amusingly named wind turbines in England. Before it opened in November 2011, Low Spinney Wind Farm's turbines were named by school children from Gilmorton. Acquired in May 2012, the four turbines are rated at just over 2MW, giving the site an installed capacity of 8.2MW with the ability to generate enough energy to power 6,766 homes.
10 MW
28,129 MWh/year
3,265 t/year
Malhadas Wind Farm comprises 15 Vestas V47 turbines rated at 660kW each for a total installed capacity of 6.9MW.
12 MW
30,702 MWh/year
3,651 t/year
Malhadizes Wind Farm comprises 6 Enercon E66 turbines rated at 2000kW each for a total installed capacity of 12MW.
67 MW
147,852 MWh/year
Malhanito Wind Farm comprises 29 Enercon E82 turbines rated at 2300kW each for a total installed capacity of 66.7MW.
12 MW
25,282 MWh/year
1,580 t/year
Marcellois Wind Farm comprises six Vestas V100 turbines rated at 2000kW each for a total installed capacity of 12MW.
12 MW
22,564 MWh/year
1,425 t/year
Massingy Wind Farm comprises six Vestas V100 turbines rated at 2000kW each for a total installed capacity of 12MW.
13 MW
19,061 MWh/year
1,264 t/year
Mazeray-Bignay Wind Farm is located in the communes of Mazeray and Bignay, 21km north of Saintes, in the Charente-Maritime department on an open agricultural plateau along the A10 motorway. Commissioned in March 2013, it comprises five Nordex N90 turbines for a total installed capacity of 12.5MW.
9 MW
26,447 MWh/year
3,471 t/year
Meroicinha Wind Farm comprises four Vestas turbines for a total installed capacity of 9MW.
47 MW
81,855 MWh/year
21,986 t/year
The photovoltaic plant will be located in the municipalities of Apricena and San Paolo di Civitate, in the province of Foggia, with a total power of 47.2696 MWp and made up of 82,208 photovoltaic modules installed on single-axis trackers.
6 MW
2,931 t/year
2
The Middleton BESS (Battery Energy Storage System) includes NEC’s GSS® end-to-end grid storage solution and its AEROS® controls system energy storage control software. It has an energy storage capacity of 3MW, an average energy production of 6.6MWh and an energy valorisation with Grid Services. It is located on the site of the 6MWp Middleton solar farm.
65 MW
178,222 MWh/year
79,844 t/year
Millennium Wind Farm is situated six miles west of Fort Augustus and has been operational since 2009. Funding from Millennium is administered by Fort Augustus and Glenmoriston Community Company and the Glengarry Trust.
56 MW
124,067 MWh/year
43,617 t/year
26
As it becomes vital to combat climate change by producing more electricity from renewable sources, allowing fossil fuels to be phased out, we are proposing to extend the existing Millennium Wind Farm west of Fort Augustus and north of Invergarry.
Our proposal is for up to eight wind turbines to the east of the existing wind farm with an installed capacity of around 56 MW
675 MW
1,000,000 t/year
Nadara is developing the 675MW Minervia Energia floating offshore wind farm located off the coast of Catanzaro
52 MW
84,649 MWh/year
27,373 t/year
Minervino Wind Farm is located in Apulia, around 43 miles west of Bari. The site area is on an easily accessible rolling plateau at an altitude between 1,640 and 1,970 meters above sea level. Minervino comprises 26 turbines and has a total installed capacity of 52MW.
37 MW
100,901 MWh/year
45,204 t/year
Minsca Wind Farm is situated near the village of Bankshill, east of Lockerbie in Dumfries and Galloway. Minsca comprises 16 wind turbines each rated at 2.3MW, with an overall site capacity of 36.8MW.
Dumfries and Galloway Council have approved a planning application to extend the planning consent for Minsca Wind Farm by an additional 10 years.
12 MW
27,028 MWh/year
1,652 t/year
Montagne Fayel Wind Farm comprises six Vestas V100 turbines for a total installed capacity of 12MW.
8 MW
11,845 MWh/year
774 t/year
Montloué Wind Farm comprises four Enercon E70 turbines rated at 2000kW each for a total installed capacity of 8MW.
44 MW
120,224 MWh/year
18,110 t/year
Munera I Wind Farm comprises 22 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 44MW.
© 2026 Nadara Limited – Company number SC546368