Green Lakes
- United States
- Solar
- Operational
Installed capacity
8 MW
Energy produced
6,275 MWh/year
CO2 reductions
775 t/year
Green Lakes is a Community Solar project in upstate New York.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
101 – 120 of 257 projects
8 MW
6,275 MWh/year
775 t/year
Green Lakes is a Community Solar project in upstate New York.
9 MW
14,869 MWh/year
877 t/year
Gueltas Wind Farm comprises six Repower MD77 turbines rated at 1500kW each for a total installed capacity of 9MW.
3 MW
2,865 MWh/year
1,404 t/year
The solar photovoltaic plant at Harford, New York, is grid-connected and has been in operation since December 2015. The plant has an installed capacity of 2.87MWp with 9,120 polycrystalline silicon modules distributed across 456 strings. The fixed-tilt array is set to a tilt angle of 20°.
7 MW
18,919 MWh/year
8,476 t/year
Hill of Fiddes Wind Farm is situated on arable farmland near the Aberdeenshire villages of Ellon, Pitmeddon and Foveran. Commercial operations at the site began in February 2010 and the wind farm was taken into the Nadara portfolio in May 2012. The wind farm has three turbines, each rated at 2.3MW giving Hill of Fiddes an installed capacity of 6.9MW and the ability to generate enough energy to power 5,693 homes.
7 MW
16,685 MWh/year
2,018 t/year
Igreja Nova Wind Farm is split between Igreja Nova I and Igreja Nova II using Vestas V66 and Nordex N60 turbines for a total installed capacity of 7.2MW.
12 MW
25,285 MWh/year
765 t/year
Illois Wind Farm was inaugurated in September 2022 with six Vestas V90 turbines of 2000kW each for a total installed capacity of 12MW. Nadara developed a community benefit scheme with the 'Bien Vivre à Illois' Association to finance local projects for the village and residents.
30 MW
14,664 t/year
10
Iowa Wind has an of installed capacity of 30MW and is equipped with 10 turbines. The project is located in central Iowa, northeast of the city of Des Moines. All turbines lie within a within a 65-mile radius of one another. The wind turbine generators are in the vicinities of Grinnell, Huxley, Ames, Nevada, and Iowa Falls.
38 MW
77,600 MWh/year
20,800 t/year
The photovoltaic system will fall entirely within the territory of the Municipality of Ramacca, in the province of Catania.
The plant will be connected to Terna’s HV grid via a new 150kV electrical station planned in Maglitta.
1 MW
1,895 MWh/year
242 t/year
Jarmeleira Wind Farm comprises a single Vestas V52 turbine for a total installed capacity of 0.85MW.
8 MW
8,629 MWh/year
775 t/year
Judd Road is a Community Solar project in upstate New York.
1,200 MW
2,000,000 t/year
Nadara is developing the 900MW Kailia Energia floating offshore wind farm located off the southern coast of the province of Brindisi.
9 MW
7,957 MWh/year
736 t/year
Keranfouler Wind Farm comprises seven Bonus B1300 turbines rated at 1300kW each for a total installed capacity of 9.1MW.
68 MW
185,077 MWh/year
82,914 t/year
Kilbraur Wind Farm is situated around six miles north-west of Golspie, Sutherland and has been operational since 2009. Funding from Kilbraur is administered by the Kilbaur Windfarm Community Benefit Trust and benefits organisations in the local area.
23 MW
61,692 MWh/year
27,638 t/year
Kingsburn Wind Farm is situated in the Gargunnock Hills 12 miles southwest of Stirling and has been operational since 2016. Funding from Kingsburn is administered by Foundation Scotland and benefits organisations in the local area.
5 MW
13,161 MWh/year
5,896 t/year
Kirkby Moor Wind Farm has been operating since 1993 and planning was successful for extending its operational life until 2027.
60 MW
186,000 MWh/year
35,972 t/year
11
Naturalis Energy Developments Ltd has developed proposals for a wind farm with the potential for solar and battery storage on site, on the southern edge of the North Kyle forest between Patna and Rankinston. The proposed site for Knockkippen wind farm, overlooks several former opencast mines.
Between 1849 and 1965 there were around 52 ironstone and coal mines in the Patna area and mining was the mainstay of the local economy but subsequent pit closures have adversely impacted on local employment and economy.
This renewable energy project will help the local – and Scottish economy – to meet its zero carbon target by 2045, generating clean, green energy from nature.
5 MW
2
1 MW
1,672 MWh/year
751,000 t/year
Nadara's La Calce solar farm is connected to the public distribution network without the need to install electricity accumulators. The plant comprises 1,512 polycrystalline photovoltaic modules installed on a biaxial tracker.
47 MW
74,801 MWh/year
20,000 t/year
The photovoltaic system is developed in the territory within the municipality of Pozzolo Formigaro (AL), north of the town of Pozzolo Formigaro and on the border with the municipality of Tortona (AL), has a total rated power of 46.8 MW and consists of n.74,952 photovoltaic modules installed on monoaxial solar trackers.
The photovoltaic component will be supplemented by an agricultural project that involves the planting of an intensive multi-varietal hazelnut thand the constitution of a stable lawn used as throughout the year.
29 MW
69,614 MWh/year
10,614 t/year
La Dehesica Wind Farm comprises 19 GE 1.5SLE turbines rated at 1500kW each for a total installed capacity of 28.5MW.
© 2026 Nadara Limited – Company number SC546368