This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.

Skip to main content
Background image Nadara

Our Sites

Filter options

Filter by location

Filter by technology

Filter by status

La Manganizza

  • Italy
  • Solar
  • Under construction
  • Installed capacity

    8 MW

  • Energy produced

    12,900 MWh/year

  • CO2 reductions

    3,465 t/year

The La Manganizza photovoltaic plant is located in the municipality of Manzano, in the province of Udine. It has a total rated power of about 8.16 MW and consists of 13,600 photovoltaic modules installed on single-axis trackers. It is located in an agricultural land with a total extension of about 15 hectares that has a regular orographic structure and is mainly flat at 60 meters above sea level.

Website

La Mardelle

  • France
  • Wind
  • Operational
  • Installed capacity

    6 MW

  • Energy produced

    10,081 MWh/year

  • CO2 reductions

    798 t/year

La Mardelle Wind Farm comprises two turbines rated at 3000kW each for a total installed capacity of 6MW.

La Navica

  • Spain
  • Wind
  • Operational
  • Installed capacity

    30 MW

  • Energy produced

    74,136 MWh/year

  • CO2 reductions

    12,007 t/year

La Navica Wind Farm comprises 20 GE 1.5XLE turbines rated at 1500kW each for a total installed capacity of 30MW.

Lagoa Funda

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    12 MW

  • Energy produced

    39,808 MWh/year

  • CO2 reductions

    4,680 t/year

Lagoa Funda Wind Farm comprises six Vestas V90 turbines rated at 2000kW each for a total installed capacity of 12MW.

Lambrigg

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    7 MW

  • Energy produced

    17,822 MWh/year

  • CO2 reductions

    7,984 t/year

Lambrigg Wind Farm can be seen from Junction 37 of the M6, adjacent to Lambrigg Fell, a grassy moorland just outside of Kendal in Cumbria. The wind farm comprises five wind turbines each rated at 1.3MW with an overall site capacity of 6.5MW. It has been operational since September 2000.

South Lakeland District Council approved a planning application to extend consent for Lambrigg Wind Farm by an additional 10 years.

Landolina

  • Italy
  • Solar
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    18,562 MWh/year

  • CO2 reductions

    8,600 t/year

The 9.7MWp agrivoltaic plant in the Landolina district of Scicli (province of Ragusa) combines the production of renewable energy with the enhancement of local agricultural crops while respecting the environmental peculiarities of the area. The project leverages innovative methods, which have already been successfully adopted in other countries but a novelty in Italy, thanks to the adoption of specific agrivoltaic techniques that generate a beneficial impact on the territory. In order to allow local residents and Sicilian citizens to benefit from a profitable, sustainable and secure investment, Nadara launched and successfully ran the first lending-crowdfunding initiative of the 'Coltiviamo Energia' programme.

Website

Lazenay II

  • France
  • Wind
  • Operational
  • Installed capacity

    22 MW

  • Energy produced

    42,965 MWh/year

Lazenay II Wind Farm comprises nine Nordex N1170 turbines rated at 2400kW each for a total installed capacity of 21.6MW.

Le Fouy

  • France
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    14,702 MWh/year

  • CO2 reductions

    12,500 t/year

Le Fouy Wind Farm is located in the commune of Chemillé-en-Anjou, 16km north-east of Cholet, in the department of Maine-et-Loire and involved both the former communes of La Chapelle-Rousselin and Saint-Georges-des-Gardes. The wind farm comprises four Nordex N90 turbinesfor a total installed capacity of 10MW.

Le Gollot

  • France
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    10,320 MWh/year

  • CO2 reductions

    786 t/year

Le Gollot Wind Farm comprises eight Bonus B1300 turbines rated at 1300kW each for a total installed capacity of 10.4MW.

Le Mée

  • France
  • Wind
  • Operational
  • Installed capacity

    9 MW

  • Energy produced

    14,088 MWh/year

  • CO2 reductions

    1,082 t/year

Le Mée Wind Farm comprises three Alstom-Ecotècnia ECO100 turbines rated at 3000kW each for a total installed capacity of 9MW.

Leomil

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    16 MW

  • Energy produced

    29,332 MWh/year

  • CO2 reductions

    3,999 t/year

Leomil Wind Farm comprises seven Nordex N90 turbines rated at 2300kW each for a total installed capacity of 16.1MW.

Leonacco Basso

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    8 MW

  • Energy produced

    11,143 MWh/year

  • CO2 reductions

    2,993 t/year

The photovoltaic impianto denominato Leonacco Basso è situato nella Regione Friuli-Venezia Giulia, nel comune di Tricesimo (UD), ha una nominal potenza complessiva di circa 7.5 MW ed è costituito da 13.536 photovoltaic module installed su tracker monoassiali.

Website

Les Crêtes

  • France
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    15,153 MWh/year

  • CO2 reductions

    12,500 t/year

Les Crêtes Wind Farm is located in the communes of La Tourlandry and Coron, 20km northeast of Cholet, in the department of Maine-et-Loire in a bocage agricultural area. It comprises four Nordex N90 turbines for a total installed capacity of 10MW.

Les Youïs

  • France
  • Solar
  • Awaiting authorisation
  • Installed capacity

    5 MW

  • Energy produced

    6,480 MWh/year

  • CO2 reductions

    5,828 t/year

The Youïs photovoltaic park project is located in the town of Longué-Jumelles in Maine-et-Loire.

Website

Limbrici

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    11 MW

  • Energy produced

    23,500 MWh/year

  • CO2 reductions

    6,300 t/year

The Limbrici photovoltaic plant will fall into the territory of the Municipality of Agrigento (AG) and will be connected to the MT network of E-Distribuzione through the existing “Agrigento 2” cabin.

Website

Lissett Airfield

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    30 MW

  • Energy produced

    82,256 MWh/year

  • CO2 reductions

    36,851 t/year

Lissett is a long-established village in the Holderness area of Yorkshire's East Riding. Mentioned in the Domesday Book, the village has an interesting recent history as it was home to the Royal Air Force's 158 Squadron during the Second World War. During a two-year period towards the end of the war, 158 Squadron's Halifax Bombers completed 250 missions, suffering the loss of 144 aircraft and 851 airmen. A memorial sculpture featuring seven airmen was erected on the base and is dedicated to the memory of those lost during the war. The 12 wind turbines on the site are also named in commemoration of the site's wartime past with eleven turbines named after aircraft that flew from the airfield and the twelfth to commemorate the six airmen who perished on July 2nd, 1943 due to an explosion in the bomb dump. Today, the village has a population of around 240 and its tranquil former airfield is home to 12 turbines, each rated at 2.5MW, giving the site an installed capacity of 30MW able to generate enough energy to power 24,754 homes.

Llyn Alaw

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    20 MW

  • Energy produced

    55,934 MWh/year

  • CO2 reductions

    25,059 t/year

Llyn Alaw (which means Lily Lake in English) is a reservoir near the town of Amlwch on the island of Anglesey. The reservoir was created by the flooding of marshlands in 1966 and it supplies 35 million litres of water a day to the northern half of the island. Llyn Alaw Wind Farm is situated to the north of the small village of Llanbabo which is close to the reservoir's eastern shore. Construction work on Llyn Alaw Wind Farm began in 1996 and it opened in October 1997. The site has 34 turbines rated at 600kW, giving the wind farm an installed capacity of 20.4MW and the ability to generate enough energy to power 16,832 homes.

Lomba da Seixa I

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    13 MW

  • Energy produced

    21,502 MWh/year

  • CO2 reductions

    3,231 t/year

Lomba da Seixa I Wind Farm comprises 10 Nordex N60 turbines rated at 1300kW each for a total installed capacity of 13MW.

Lomba da Seixa II

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    12 MW

  • Energy produced

    23,778 MWh/year

  • CO2 reductions

    3,540 t/year

Lomba da Seixa II Wind Farm comprises eight GE 1.5S turbines rated at 1500kW each for a total installed capacity of 12MW.

Lousã I

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    35 MW

  • Energy produced

    69,614 MWh/year

  • CO2 reductions

    8,188 t/year

Lousã I Wind Farm comprises 14 GE 2.5 turbines rated at 2500kW each for a total installed capacity of 35MW.

© 2026 Nadara Limited – Company number SC546368