Saint Barnabé
- France
- Wind
- Operational
Installed capacity
12 MW
Energy produced
21,155 MWh/year
CO2 reductions
1,355 t/year
Saint Barnabé Wind Farm comprises six Vestas V90 turbines rated at 2000kW each for a total installed capacity of 12MW.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
201 – 220 of 258 projects
12 MW
21,155 MWh/year
1,355 t/year
Saint Barnabé Wind Farm comprises six Vestas V90 turbines rated at 2000kW each for a total installed capacity of 12MW.
12 MW
10,364 MWh/year
1,175 t/year
Saint Jacques Wind Farm comprises four Alstom-Ecotècnia ECO100 turbine rated at 3000kW each for a total installed capacity of 12MW.
20 MW
33,783 MWh/year
9,074 t/year
The photovoltaic plant will be located in Basilicata, in the municipality of Grottole, in the province of Matera, with a total nominal power of approximately 19.81 MW and a storage plant.
74 MW
136,800 MWh/year
36,744 t/year
The plant, known as the “San Leone” wind farm, will consist of 12 wind turbines with a nominal unit power of up to 6.2 MW, for a total installed power of up to 74.4 MW, combined with an electrochemical storage system with nominal power equal to 10 MW and capacity 40 MWh.
The three Calabrian municipalities belong to the province of Crotone and border the municipalities of Strongoli, Rocca di Neto, Santa Severina, San Mauro Marchesato, Roccabernarda, Mesoraca and Belcastro.
36 MW
61,912 MWh/year
9,470 t/year
San Lorenzo D Wind Farm comprises 18 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 36MW.
30 MW
52,484 MWh/year
8,189 t/year
San Lorenzo C Wind Farm comprises 15 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 30MW.
78 MW
137,814 MWh/year
64,000 t/year
San Sostene Wind Farm is divided into two sites (north and south) in the province of Catanzaro. It is developed along the Serre mountain range, on land that is owned by the municipality. The altitude of the site varies between 900m and 1,200m above sea level. The total installed capacity of 78MW is divided across these two sites between the ridges that make up the mountain range: the southern ridge, on which 27 turbines (40.5MW) have been installed, and the northern ridge, on which 15 turbines (37.5MW).
Certifications:
ISO 14001:2015
64 MW
126,000 MWh/year
36,900 t/year
Nadara’s PSF Santo Toribio project will be located in Chiva, in Valencia (Spain). This new photovoltaic park will mean an estimated production of 126 GWh/year, enough to supply energy to more than 80,000 homes. The Chiva photovoltaic solar energy facility, whose construction is scheduled to begin in 2023, plans to occupy around 111 hectares and additionally reforest another 39.
6 MW
15,474 MWh/year
2,049 t/year
São Cristóvão Wind Farm comprises three Vestas turbines for a total installed capacity of 5.65MW.
12 MW
24,312 MWh/year
3,003 t/year
São Macário Wind Farm comprises five Nordex N90 turbines rated at 2300kW each for a total installed capacity of 11.5MW.
7 MW
14,429 MWh/year
1,641 t/year
São Mamede Wind Farm comprises three Nordex N90 turbines rated at 2300kW each for a total installed capacity of 6.9MW.
46 MW
90,000 MWh/year
24,200 t/year
The plant will fall within the territory of the Municipality of Belpasso, in the Finocchiara district.
The connection works to the national electricity grid, which provide for connection to Terna’s HV grid via the future “Pantano D’Arci” electricity transformation station, will instead fall within the Municipality of Catania.
6 MW
6,244 MWh/year
691 t/year
Sauvageons Wind Farm comprises two Alstom-Ecotècnia ECO100 turbine rated at 3000kW each for a total installed capacity of 6MW.
10 MW
28,104 MWh/year
12,591 t/year
Following 15 months of construction, the five turbines at Seamer Wind Farm opened for business in November 2012. The wind farm's turbines are situated on land owned by three neighbouring farms located between the villages of Seamer and Hilton. Hilton is in the civil parish of the borough of Stockton-on-Tees and has an estimated population of around 400 while Seamer is in the Hambleton district of North Yorkshire, England, with an estimated population of 566. Despite their proximity to Teesside, the villages have a real rural feel, and there are a number of well-used public footpaths in the surrounding area. Seamer's turbines are rated at just over 2MW, giving the site an installed capacity of 10.25MW with the ability to generate enough energy to power 8,457 homes.
12 MW
22,226 MWh/year
1,160 t/year
Segur Wind Farm comprises six Vestas V90 turbines for a total installed capacity of 12MW.
12 MW
24,943 MWh/year
2,971 t/year
Senhora da Vitória Wind Farm comprises eight GE 1.5S turbines rated at 1500kW each for a total installed capacity of 12MW.
33 MW
69,036 MWh/year
Serra Leiranco Wind Farm comprises 14 Enercon E92 turbines rated at 2350kW each for a total installed capacity of 32.9MW.
8 MW
22,483 MWh/year
10,073 t/year
Sisters is a near neighbour to Nadara's North Steads Wind Farm and is located on the site of a restored former opencast coal mine near Widdrington Village in Northumberland. Widdrington, which is nearly six miles north east of Morpeth, has an interesting history dating back to the Norman era with a Grade 1 listed church and a ruined 18th century castle. The wind farm's turbines are rated at just over 2MW, giving the site an installed capacity of 8.2MW with the ability to generate enough energy to power 6,766 homes.
2 MW
1,601 MWh/year
1,009 t/year
The Snyder Road PV solar project is located close to the towns of Lansing and Northeast Ithaca in the State of New York. With a capacity of 2.07MWp and 6,768 polycrystalline silicon PV modules set to a tilt angle of 17°, this plant has been grid-connected since June 2018.
22 MW
44,900 MWh/year
12,100 t/year
The Sole Siciliano 1, 2, 3 & 4 plants will be built within the territory of the Municipality of Santa Croce Camerina, in the Spinazza district at a distance of a few hundred meters from each other and will be connected to the E-Distribuzione MT network via the existing “Cabina Santa Croce Camerina”.
© 2026 Nadara Limited – Company number SC546368