C.da Cangiatore

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    10 MW

  • Energy produced

    19,800 MWh/year

  • CO2 reductions

    5,300 t/year

The Cangiatore photovoltaic system will fall within the territory of the Municipality of Belpasso, in the Cangiatore district and will be connected to the MT E-Distribuzione network through the existing “Cabina Belpasso”.

Cabeço Alto

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    12 MW

  • Energy produced

    24,577 MWh/year

  • CO2 reductions

    3,745 t/year

Cabeço Alto Wind Farm comprises nine Nordex N60 turbines rated at 1300kW each for a total installed capacity of 11.7MW.

Cabezo de San Roque

  • Spain
  • Wind
  • Operational
  • Installed capacity

    23 MW

  • Energy produced

    47,494 MWh/year

  • CO2 reductions

    15,000 t/year

Cabezo de San Roque Wind Farm is located in the municipality of La Muela, around 18 miles south-west of Zaragoza in the Spanish region of Aragon. It is situated on a vast plateau, around 2,000 feet above sea level. The 23.25MW site comprises 31 turbines.

Calanhel

  • France
  • Wind
  • Operational
  • Installed capacity

    9 MW

  • Energy produced

    11,691 MWh/year

  • CO2 reductions

    853 t/year

Calanhel Wind Farm comprises 11 Gamesa G58 turbines rated at 850kW each for a total installed capacity of 9.35MW.

Campanario

  • Spain
  • Wind
  • Operational
  • Installed capacity

    38 MW

  • Energy produced

    88,730 MWh/year

  • CO2 reductions

    15,250 t/year

Campanario Wind Farm comprises 19 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 38MW.

Campos de Levante

  • Spain
  • Solar
  • Awaiting authorisation
  • Installed capacity

    102 MW

  • Energy produced

    200,000 MWh/year

  • CO2 reductions

    41,780 t/year

The PSF Campos de Levante project will be located in Chiva, Valencia. This new photovoltaic plant will produce an estimated 200 GWh/year, enough to supply energy to more than 80,000 households.

Website

Campos de Zuloaga

  • Spain
  • Solar
  • Awaiting authorisation
  • Installed capacity

    56 MW

  • Energy produced

    119,000 MWh/year

  • CO2 reductions

    24,859 t/year

Campos de Zuloaga project will be located between the municipalities of Cizur and Cendea de Olza in Navarra (Spain). This new photovoltaic park is estimated tol produce 119 GWh/year, enough to supply energy to more than 20,000 households.

Website

Candeeiros

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    111 MW

  • Energy produced

    324,344 MWh/year

  • CO2 reductions

    39,431 t/year

Candeeiros Wind Farm comprises 37 Vestas V90 turbines rated at 3000kW each for a total installed capacity of 111MW.

Candeeiros OVP

  • Portugal
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    33,963 MWh/year

  • CO2 reductions

    4,422 t/year

The Candeeiros overpowering site comprises five Senvion MM100 turbines rated at 2000kW each for a total installed capacity of 10MW.

Capofeto

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    8 MW

  • Energy produced

    15,400 MWh/year

  • CO2 reductions

    4,100 t/year

Capofeto photovoltaic plant, in the province of Trapani, will have a total nominal power of 7.8 MWp (Megawatt peak). The plant will be located in the municipality of Marsala, in the Baglio Chitarra district, and it will be connected to E-Distribuzione’s MV network through the Matarocco Primary Cabin.

Website

Cardonita

  • Italy
  • Solar
  • Operational
  • Installed capacity

    4 MW

  • Energy produced

    5,133 MWh/year

  • CO2 reductions

    2,480 t/year

The Cardonita solar plant isconnected to the public distribution network, so did not require the installation of electricity accumulators. The plant comprises 16,440 polycrystalline photovoltaic modules which are south facing and tilted at a 20° angle to optimise the annual yield.

Carrecastro

  • Spain
  • Wind
  • Operational
  • Installed capacity

    10 MW

  • Energy produced

    28,497 MWh/year

  • CO2 reductions

    17,000 t/year

Carrecastro Wind Farm comprises four Gamesa G114 turbines, for a total installed capacity of 10MW. The project included new roads and road improvements, as well as electricity infrastructure such as ground cables, switchgears and a transformer substation.

Castillo Eólico León

  • Spain
  • Wind
  • Awaiting authorisation
  • Installed capacity

    75 MW

  • Energy produced

    235,000 MWh/year

  • CO2 reductions

    49,091 t/year

The Castillo Eólico León cluster comprises the wind projects of Porqueros, Ucedo and Veldedo de Nadara and will be located in the municipalities of Magaz de Cepeda, Brazuelo, Villagatón, Santa Colomba de Somoza and Torre del Bierzo, in the province of León (Spain). .
These new wind farms will mean a total estimated production of 235 GWh/year, enough to supply energy to more than 30,000 homes.

Website

Castillo Eólico Palencia

  • Spain
  • Wind
  • Awaiting authorisation
  • Installed capacity

    144 MW

  • Energy produced

    510,000 MWh/year

  • CO2 reductions

    106,539 t/year

The Castillo Eólico Palencia cluster comprises the wind projects of Villaherreros, Villaumbrales and Perales de Nadara and will be located in the municipalities of Villaherreros, Villasarracino, Villaumbrales, Perales and Becerril de Campos, in the province of Palencia. These new wind farms will mean a total estimated production of 510 GWh/year, enough to supply energy to more than 50,000 homes.

Website

Castrum

  • Italy
  • Wind
  • Awaiting authorisation
  • Installed capacity

    30 MW

  • Energy produced

    86,000 MWh/year

  • CO2 reductions

    46,000 t/year

Castrum is a wind farm project located in the Municipality of Castronovo di Sicilia (PA) and, for connection works, in the Municipality of Cammarata (AG).

Website

Causeymire

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    48 MW

  • Energy produced

    132,433 MWh/year

  • CO2 reductions

    59,330 t/year

Causeymire Wind Farm is the most northerly site in Nadara's UK portfolio, located 15 miles west-northwest of the town of Wick next to the A9 main road on the way to Thurso. The wind farm is situated on Dale Moss, a large area of peatland commanding views across the wilderness of the Flow Country to Morven, the highest point in Caithness. The land below the turbines is also used for grazing cattle. Its 21 turbines are rated at 2.3MW and the site has an installed capacity of 48.3MW, generating enough energy to power 39,853 homes.

Cefn Croes

  • United Kingdom
  • Wind
  • Operational
  • Installed capacity

    59 MW

  • Energy produced

    160,400 MWh/year

  • CO2 reductions

    71,859 t/year

Cefn Croes Wind Farm consists of 39 turbines and is located near Devils Bridge, 15km east of Aberystwyth, Wales. It has been operational since 2005. Funding from Cefn Croes is administered by the Cefn Croes Wind Farm Community Trust.

Cerfontaine

  • Belgium
  • Wind
  • Operational
  • Installed capacity

    22 MW

  • Energy produced

    39,825 MWh/year

  • CO2 reductions

    6,142 t/year

Cerfontaine Wind Farm comprises 11 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 22MW.

Cerro

  • Italy
  • Solar
  • Awaiting authorisation
  • Installed capacity

    46 MW

  • Energy produced

    81,059 MWh/year

  • CO2 reductions

    21,772 t/year

The photovoltaic plant is located in the municipality of San Paolo di Civitate (FG), in Puglia.
It has a total nominal power of approximately 46 MW generated in 14 photovoltaic fields connected to each other via underground cable ducts.
The land is agricultural and has a regular and mainly flat orographic structure for a total area of about 64 hectares.

Website

Cerros de Radona

  • Spain
  • Wind
  • Operational
  • Installed capacity

    40 MW

  • Energy produced

    87,398 MWh/year

  • CO2 reductions

    14,403 t/year

Cerros de Radona Wind Farm has an installed capacity of 40MW from its 16 GE2.5XL 2500kW-rated turbines.