Chão Falcão
- Portugal
- Wind
- Operational
Installed capacity
81 MW
Energy produced
173,889 MWh/year
CO2 reductions
20,201 t/year
Chão Falcão Wind Farm comprises 35 Nordex N90 turbines rated at 2300kW each for a total installed capacity of 80.5MW.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
61 – 80 of 257 projects
81 MW
173,889 MWh/year
20,201 t/year
Chão Falcão Wind Farm comprises 35 Nordex N90 turbines rated at 2300kW each for a total installed capacity of 80.5MW.
10 MW
24,023 MWh/year
2,840 t/year
The Chão Falcão overpowering site comprises five Senvion MM100 turbines rated at 2000kW each for a total installed capacity of 10MW.
10 MW
9,365 MWh/year
2,091 t/year
Chimay I Wind Farm comprises four GE 2.5XL turbines rated at 2500kW each for a total installed capacity of 10MW.
14 MW
21,665 MWh/year
3,244 t/year
Chimay II Wind Farm comprises two GE 2.5XL turbines rated at 2500kW each and three GE 2.85 turbines rated at 2850kW each for a total installed capacity of 13.55MW.
4 MW
8,624 MWh/year
1,083 t/year
Chiqueiro Wind Farm comprisestwo Vestas V80 turbines rated at 2000kW each for a total installed capacity of 4MW.
10 MW
17,091 MWh/year
1,121 t/year
Clos Bataille Wind Farm comprises four Nordex N90 turbines rated at 2500kW each for a total installed capacity of 10MW.
7 MW
11,500 MWh/year
3,088 t/year
The photovoltaic plant is located in the Molise region about 3.5 km from the town of Campomarino.
10 MW
16,374 MWh/year
Coudray Wind Farm comprises four Nordex N100 turbines rated at 2500kW each for a total installed capacity of 10MW.
21 MW
23,000 MWh/year
The Perelles agrivoltaic farm project is located in the town of Mézidon Vallée d’Auge in Calvados.
30 MW
82,256 MWh/year
36,851 t/year
Dalswinton Wind Farm is around nine miles north of the town of Dumfries near the village of Dalswinton, Scotland. The wind farm comprises 15 wind turbines each rated at 2MW with an overall site capacity of 30MW, and has been operational since June 2008.
Dumfries and Galloway Council have approved a planning application to extend the planning consent for Dalswinton Wind Farm by an additional 10 years.
12 MW
26,400 MWh/year
1,840 t/year
Dammarie Wind Farm comprisessix Vestas V90 turbines rated at 2000kW each for a total installed capacity of 12MW.
6 MW
7,788 MWh/year
2,931 t/year
The solar photovoltaic plant in Dartmouth, Massachusetts has been grid-connected since May 2014. The plant has an installed capacity of 6.0MWp and comprises 19,988 polycrystalline modules distributed in 1,502 strings. The installation has a fixed orientation in a southerly direction with a tilt angle of 25°.
20 MW
52,374 MWh/year
6,202 t/year
Degracias Wind Farm comprises 10 Vestas V80 turbines rated at 2000kW each for a total installed capacity of 20MW.
50 MW
88,066 MWh/year
14,832 t/year
The Dehesilla I wind farm comprises 25 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 50MW.
50 MW
89,732 MWh/year
14,635 t/year
The Dehesilla II wind farm comprises 25 Gamesa G90 turbines rated at 2000kW each for a total installed capacity of 50MW.
50 MW
88,637 MWh/year
Nadara's Desafio Solar plant is located to the south-east of Zaragoza, close to the river Ebro. It has a total installed capacity of 49.88MW.
1 MW
768 MWh/year
252 t/year
Nadara's Donema solar plant is located in Castel San Pietro, in the countryside near Bologna. With an installed capacity of 0.94MWp, it has been operational since 2011.
38 MW
102,821 MWh/year
46,064 t/year
Earlsburn Wind Farm consists of 15 turbines and is located in the Gargunnock Hills to the southwest of Stirling. It has been operational since 2007. Funding from Earlsburn is administered by Foundation Scotland and benefits organisations in the local area.
35 MW
7
Naturalis Energy Development Ltd, a joint venture between Nadara and Reg Power Management Ltd are experienced renewable energy developers and have been undertaking studies for a windfarm located approximately 2.2 km (4 km to the centre of the Site) due south of the village of Gargunnock, Stirling. The project would form an extension to the existing Earlsburn Wind Farm.
24 MW
61,676 MWh/year
10,667 t/year
El Nogal Wind Farm comprises 12 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 24MW.
© 2026 Nadara Limited – Company number SC546368