Ayssènes - Le Truel
- France
- Wind
- Operational
Installed capacity
12 MW
Energy produced
25,746 MWh/year
CO2 reductions
1,250 t/year
Ayssènes - Le Truel Wind Farm comprises eight Acciona AW82 turbines for a total installed capacity of 12MW.
This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
21 – 40 of 257 projects
12 MW
25,746 MWh/year
1,250 t/year
Ayssènes - Le Truel Wind Farm comprises eight Acciona AW82 turbines for a total installed capacity of 12MW.
10 MW
26,322 MWh/year
11,792 t/year
Bears Down Wind Farm is located in Cornwall approximately 1.5km south east of the village of St Eval. The wind farm opened in September 2001 and straddles the boundary of North Cornwall and Restormel District Councils with the turbines occupying the area from Denzell Downs in the south to Bears Downs reservoir in the north. The eastern boundary is demarcated by the Mawgan in Pydar parish limits. Its 16 turbines are rated at 600kW and have the capacity to generate 9.6MW of power.
10 MW
14,676 MWh/year
1,025 t/year
Beaurevoir Wind Farm comprises five Gamesa G90 turbines for a total installed capacity of 10MW.
8 MW
23,032 MWh/year
10,318 t/year
Beinn Ghlas Wind Farm is situated amongst the hills of the Barguillean Estate near Taynuilt in Argyll. The site‘s 14 turbines sit within an area of grazing land and began commercial operations in May 1999. The 14 Siemens Bonus turbines are rated at 600kW giving the wind farm an installed capacity of 8.4MW.
The current operational wind farm has the potential to operate safely and efficiently for significantly longer than was originally intended, as set out in the life extension application which was consented in 2022.
Nadara has now submitted a planning application to replace the existing wind turbines at Beinn Ghlas with more modern, higher producing machines. The planning application has been validated by Argyll and Bute Council, planning reference 25/01240/PP.
For further information please follow the link below to visit the Beinn Ghlas Wind Farm website.
59 MW
139,584 MWh/year
Beira Interior Wind Farm comprises 25 Enercon E92 turbines rated at 2350kW each for a total installed capacity of 58.75MW.
1,200 MW
Nadara is developing the 1.8GW Bellrock floating offshore wind farm located off the coast of Aberdeen as part of the ScotWind offshore wind leasing round.
35 MW
72,700 MWh/year
19,500 t/year
The Biddine photovoltaic system will fall within the territory of the Municipality of Acate (RG), while the connection works to the national electricity network will fall within the Municipality of Caltagirone (CT) and provide for the connection to the AT network of Terna on the RTN line (National Transmission Network) “Favara – Chiaramonte Gulfi”.
7 MW
15,203 MWh/year
2,052 t/year
Bigorne Wind Farm comprises four Vestas V66 turbines rated at 1750kW each for a total installed capacity of 7MW.
8 MW
20,564 MWh/year
9,213 t/year
Situated close to Crow Edge near the town of Penistone in South Yorkshire, Blackstone Edge Wind Farm became fully operational in March 2013. Its three turbines have an installed capacity of 7.5MW and they're located on land that's currently used for pastoral farming, although the local area was historically associated with coal and clay mining. With a summit peaking at 349m, Blackstone Edge is ideally situated to capture the winds that blow across the Pennines, and the three turbines generate enough electricity to power an estimated 6,188 homes. Construction at Blackstone Edge Wind Farm began in July 2012 and the development took nine months to complete.
9 MW
11,679 MWh/year
913 t/year
Blés d'Or Wind Farm comprises three Alstom-Ecotècnia ECO100 turbines rated at 3000kW each for a total installed capacity of 9MW.
13 MW
21,643 MWh/year
1,560 t/year
Bois Ballay Wind Farm is located in the commune of Mareuil-sur-Arnon, 26km southwest of Bourges, in the Cher department on an open agricultural plateau. Commissioned in September 2011, it comprises five Nordex N100 turbines rated at 2500kW each for a total installed capacity of 12.5MW.
52 MW
118,781 MWh/year
20,320 t/year
Bon Vent Vilalba Wind Farm has an installed capacity of 51.8MW and comprises 21 Vestas V90 turbines.
60 MW
159,927 MWh/year
20,500 t/year
Bornes Wind Farm comprises 24 Nordex N90 turbines rated at 2500kW each for a total installed capacity of 60MW.
10 MW
29,231 MWh/year
3,808 t/year
The Bornes overpowering site comprises five Senvion MM100 turbines rated at 2000kW each for a total installed capacity of 10MW.
2 MW
4,606 MWh/year
592 t/year
Borninhos Wind Farm comprises a single Enercon E66 turbine for a total installed capacity of 2MW.
10 MW
21,546 MWh/year
1,059 t/year
Bourbriac Wind Farm comprises five Vestas V90 turbines rated at 2000kW each for a total installed capacity of 10MW.
17 MW
45,652 MWh/year
20,452 t/year
The Boyndie wind farm is located on a former World War II airfield just over a mile inland from the north coast of Aberdeenshire, between Portsoy and Banff and has been operational since 2006. Funding from Boyndie is administered by Whitehills and District Community Council and benefits community organisations in the local area.
900 MW
Nadara is developing the 900MW Broadshore floating offshore wind farm located north of Fraserburgh as part of the ScotWind offshore wind leasing round.
10 MW
27,145 MWh/year
12,161 t/year
Bryn Titli Wind Farm is sited on a plateau just to the north of a Site of Special Scientific Interest between Rhayader and Llangurig, Powys. This was a major factor in the environmental assessment of the project and care was taken in the planning phase to avoid areas of ecological interest and to minimise the effects on the local environment. The wind farm has proven to be in an excellent location for renewable energy generation and continues to operate well and planning was therefore submitted to extend its operational life until 2027 with a further 12 months to allow decommissioning and restoration of the site until June 2028.
159 MW
307,079 MWh/year
72,598 t/year
Buddusò Wind Farm has an installed capacity of 158.7MW and is equipped with 69 Enercon E70 turbines. It is located toward the north-east of the island of Sardinia, in the province of Sassari on a plateau between 2,300 and 3,300 feet above sea level. The excellent wind characteristics, favourable conditions for connection to the electricity grid, modest environmental impact and the positive effect on local communities make Buddusò and Alà dei Sardi one of the most appealing areas in Italy for building a wind farm. This farm can generate around 330GWh of electricity per year, positioning it as Italy’s largest wind farm and one of the biggest in Europe.
© 2026 Nadara Limited – Company number SC546368