Bigorne
- Portugal
- Wind
- Operational
Installed capacity
7 MW
Energy produced
15,203 MWh/year
CO2 reductions
2,052 t/year
Bigorne Wind Farm comprises four Vestas V66 turbines rated at 1750kW each for a total installed capacity of 7MW.
We use cookies to ensure you get the best experience on our site. About our cookies.
To do that, please confirm that we may use functionality cookies.
Find out more in our Cookie Policy and Privacy Policy.
We operate onshore and offshore wind, solar, waste to energy, biomass and energy storage sites in Europe and the US. Check out our assets and projects by country, technology or stage of development on this interactive map.
21 – 40 of 259 projects
7 MW
15,203 MWh/year
2,052 t/year
Bigorne Wind Farm comprises four Vestas V66 turbines rated at 1750kW each for a total installed capacity of 7MW.
8 MW
20,564 MWh/year
9,213 t/year
Situated close to Crow Edge near the town of Penistone in South Yorkshire, Blackstone Edge Wind Farm became fully operational in March 2013. Its three turbines have an installed capacity of 7.5MW and they're located on land that's currently used for pastoral farming, although the local area was historically associated with coal and clay mining. With a summit peaking at 349m, Blackstone Edge is ideally situated to capture the winds that blow across the Pennines, and the three turbines generate enough electricity to power an estimated 6,188 homes. Construction at Blackstone Edge Wind Farm began in July 2012 and the development took nine months to complete.
9 MW
11,679 MWh/year
913 t/year
Blés d'Or Wind Farm comprises three Alstom-Ecotècnia ECO100 turbines rated at 3000kW each for a total installed capacity of 9MW.
13 MW
21,643 MWh/year
1,560 t/year
Bois Ballay Wind Farm is located in the commune of Mareuil-sur-Arnon, 26km southwest of Bourges, in the Cher department on an open agricultural plateau. Commissioned in September 2011, it comprises five Nordex N100 turbines rated at 2500kW each for a total installed capacity of 12.5MW.
52 MW
118,781 MWh/year
20,320 t/year
Bon Vent Vilalba Wind Farm has an installed capacity of 51.8MW and comprises 21 Vestas V90 turbines.
60 MW
159,927 MWh/year
20,500 t/year
Bornes Wind Farm comprises 24 Nordex N90 turbines rated at 2500kW each for a total installed capacity of 60MW.
10 MW
29,231 MWh/year
3,808 t/year
The Bornes overpowering site comprises five Senvion MM100 turbines rated at 2000kW each for a total installed capacity of 10MW.
2 MW
4,606 MWh/year
592 t/year
Borninhos Wind Farm comprises a single Enercon E66 turbine for a total installed capacity of 2MW.
10 MW
21,546 MWh/year
1,059 t/year
Bourbriac Wind Farm comprises five Vestas V90 turbines rated at 2000kW each for a total installed capacity of 10MW.
17 MW
45,652 MWh/year
20,452 t/year
The Boyndie wind farm is located on a former World War II airfield just over a mile inland from the north coast of Aberdeenshire, between Portsoy and Banff and has been operational since 2006. Funding from Boyndie is administered by Whitehills and District Community Council and benefits community organisations in the local area.
74 MW
240,496 MWh/year
4,212 t/year
Brattmyrliden Wind Farm comprises 19 Nordex N131 turbines, each with a capacity of 3900kW, a maximum height at the rotor tip of 199.5m, a rotor diameter of 131m and a hub height of 134m. The site also included the construction of new roads and modification of existing roads, as well as electrical infrastructure such as cables, control panels and a transformer substation.
900 MW
Nadara is developing the 900MW Broadshore floating offshore wind farm located north of Fraserburgh as part of the ScotWind offshore wind leasing round.
10 MW
27,145 MWh/year
12,161 t/year
Bryn Titli Wind Farm is sited on a plateau just to the north of a Site of Special Scientific Interest between Rhayader and Llangurig, Powys. This was a major factor in the environmental assessment of the project and care was taken in the planning phase to avoid areas of ecological interest and to minimise the effects on the local environment. The wind farm has proven to be in an excellent location for renewable energy generation and continues to operate well and planning was therefore submitted to extend its operational life until 2027 with a further 12 months to allow decommissioning and restoration of the site until June 2028.
159 MW
307,079 MWh/year
72,598 t/year
Buddusò Wind Farm has an installed capacity of 158.7MW and is equipped with 69 Enercon E70 turbines. It is located toward the north-east of the island of Sardinia, in the province of Sassari on a plateau between 2,300 and 3,300 feet above sea level. The excellent wind characteristics, favourable conditions for connection to the electricity grid, modest environmental impact and the positive effect on local communities make Buddusò and Alà dei Sardi one of the most appealing areas in Italy for building a wind farm. This farm can generate around 330GWh of electricity per year, positioning it as Italy’s largest wind farm and one of the biggest in Europe.
Certifications:
ISO 14001:2015
10 MW
19,800 MWh/year
5,300 t/year
The Cangiatore photovoltaic system will fall within the territory of the Municipality of Belpasso, in the Cangiatore district and will be connected to the MT E-Distribuzione network through the existing “Cabina Belpasso”.
12 MW
24,577 MWh/year
3,745 t/year
Cabeço Alto Wind Farm comprises nine Nordex N60 turbines rated at 1300kW each for a total installed capacity of 11.7MW.
23 MW
47,494 MWh/year
15,000 t/year
Cabezo de San Roque Wind Farm is located in the municipality of La Muela, around 18 miles south-west of Zaragoza in the Spanish region of Aragon. It is situated on a vast plateau, around 2,000 feet above sea level. The 23.25MW site comprises 31 turbines.
9 MW
11,691 MWh/year
853 t/year
Calanhel Wind Farm comprises 11 Gamesa G58 turbines rated at 850kW each for a total installed capacity of 9.35MW.
38 MW
88,730 MWh/year
15,250 t/year
Campanario Wind Farm comprises 19 Vestas V90 turbines rated at 2000kW each for a total installed capacity of 38MW.
102 MW
200,000 MWh/year
41,780 t/year
The PSF Campos de Levante project will be located in Chiva, Valencia. This new photovoltaic plant will produce an estimated 200 GWh/year, enough to supply energy to more than 80,000 households.
© 2026 Nadara Limited – Company number SC546368