This website uses cookies to ensure you get the best experience on our website. Learn more about our cookies.

Skip to main content
Background image Nadara

Farr Wind Farm

92MW

Installed capacity

Additional generating capacity

252,253 MWh/year

Energy produced

Estimated annual power generation

113,009 t/year

CO2 reductions

Avoided annually (compared to existing National Grid mix)

Farr Wind Farm is located 2.3 miles west from Farr village and over 3 miles from Tomatin in the east. The wind farm has been operational since 2005 and consists of 40 turbines, with a total installed capacity of 92MW.

Farr Wind Farm extension

Project timeline

Local impact

Our presence in the UK

Discover our projects across the UK

Get in touch

© 2026 Nadara Limited – Company number SC546368